logo

Video encyclopedia

São Luiz do Tapajós Dam

0:48

Conheçam Sao luiz do tapajos

1:03

SÃO LUIZ DO tapajos

2:00

Succes in de Amazone: deze megadam gaat niet door

2:03

Stand for the Amazon - Keep Tapajós Alive

0:46

Save the Heart of the Amazon

The São Luiz do Tapajós Dam was expected to be the second largest hydroelectric in Brazil, after Belo Monte. It would have an installed capacity of 8,040 MW and its reservoir would cover about 400 km2 in the Tapajós river basin.